Charge Home Solutions
Tesla Energy Certified Installer
Chamber of Commerce Verified Member
Electrical

400 Amp Service Upgrade

Quick answer

A 400-amp service upgrade costs $4,000–$8,000+ and suits large homes and heavy loads, multiple EVs, pool equipment, workshops, large A/C. We engineer, permit, and coordinate the full upgrade.

Typical installed cost: $4,000–$8,000

When 200 amps isn't enough, big square footage, two or three EVs, a pool, a shop, whole-home electrification, a 400-amp service delivers the capacity once and for all. It's a bigger job: often dual panels or a 320/400 meter base, always utility-coordinated.

About 400 Amp Service Upgrade

400-amp service is the answer when the load calculation simply doesn't fit in 200: estates and large homes, two or three EVs charging nightly, pool and spa equipment, a shop with welders or machine tools, or full electrification of a big footprint.

The typical build is a 320A-class meter base feeding two 200-amp panels, cleaner separation (house loads on one, garage/EV/shop on the other) and abundant breaker space. It's genuinely infrastructure: engineered, utility-coordinated, and done once.

Signs 200A won't be enough

  • Load calculation lands above ~160A of computed demand
  • Two or more EVs without willingness to load-share
  • Pool/spa plus electric heating plus large A/C
  • Workshop, ADU, or planned addition with major loads

How it works

1

Free assessment

A licensed electrician evaluates your panel, capacity, and site at no cost.

2

Transparent quote

You get a clear, written, fixed price, no surprises, no pressure.

3

Professional install

Tesla-certified electricians complete the work to code, permit pulled.

4

Inspection & warranty

We schedule inspection and back the work with our workmanship guarantee.

What's included

  • Licensed, insured & Tesla-certified electrician
  • Free in-home assessment and load calculation
  • Permit pulled and inspection scheduled
  • All materials and code-compliant wiring
  • Clean, professional install with cleanup
  • Workmanship guarantee of up to 10 years

Get a free 400 amp service upgrade estimate

Frequently asked questions

Large homes (4,500+ sq ft), multi-EV households, homes with pools/spas plus electric heating, or properties with a workshop or ADU. A load calculation confirms it before you spend.

Commonly a 320A-class meter base feeding two 200A panels, cleaner load separation and plenty of breaker space for future circuits.

Sometimes, the transformer or service drop may need attention, which the utility evaluates during coordination. We manage that process for you.

If the load calc says 200A fits, we'll tell you, we quote both paths. When 400A is right, doing it once beats two upgrades five years apart.